A133-2019 Owner-CMa as Constructor Standard Agreement Cost Plus with GMP *REVISED* (Hard Copy)

A133-2019 Owner-CMa as Constructor Standard Agreement Cost Plus with GMP *REVISED* (Hard Copy)

  • $ 39.99


This is a physical copy of the document, digital copies are also available.

A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

AIA Document A133™–2019 is intended for use on projects where a construction manager, in addition to serving as adviser to the owner during the preconstruction phase, also provides construction of the project with a guaranteed maximum price. The construction manager provides the owner with a guaranteed maximum price proposal, which the owner may accept, reject, or negotiate. Upon the owner’s acceptance of the proposal by execution of the Guaranteed Maximum Price Amendment (Exhibit A), the construction manager becomes contractually bound to provide labor and materials for the project and to complete construction at or below the guaranteed maximum price. The document divides the construction manager’s services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A133-2019 is drafted to be used in conjunction with a new Insurance and Bonds Exhibit (Exhibit B) which is a critical part of the agreement, and should be discussed with legal and insurance counsel.

AIA Document A133–2019 is coordinated for use with AIA Documents A201™–2017, General Conditions of the Contract for Construction, and B133™–2019, Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor Edition.

When to use

  • Large project
  • Where construction manager is the constructor 
  • Cost Plus with guaranteed maximum price (GMT)
  • Used in conjunction with A201, General Conditions 